Mission Oak HScharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
EV Connect https://www.evconnect.com/ 866) 816-7584
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
230980
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Starbucks
Public
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 1)
ELOP OUTDOOR ED 3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
La Piazza Ristorante Italiano
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
La Piazza Ristorante Italiano - Tesla Destination
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
LOVE'S 382 - CA #382 DC1
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Tulare
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
T5- TULARE VINE MCDONALDS T5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Tulare Union HS
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Comfort Suites Tulare
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In