1610 DCcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
SWTCH - Charge Everywhere https://charge.swtchenergy.com/ +1-844-798-2438
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Kaiser Permanente Point West
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Kaiser Point West
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Cal Expo RV Park
Public
Operational
Level 2 : Medium (Over 2kW)
NEMA 14-50
Arden Fair Mall
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Raising Canes - Store 1006
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
California Dept of Real Estate
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Doubletree by Hilton - Tesla Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Arden Fair
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Sacramento, Ca - Arden Way Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Upload your own photos for this location: Sign In