NPS MWRO: Jeff-Grounds Maintenance Yardcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily; Drivers must bring their own J1772 cordset for Level 1 charging
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
196892
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
NEMA 14-50
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
INTERPARK STATION2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
INTERPARK STATION1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
BALLPARK VILLAG STATION 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
BALLPARK VILLAG STATION 2
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Hilton St. Louis at the Ballpark - Tesla Destination
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
NESTLE PURINA. LOT 3A
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
LOT 8 STATION EXECUTIVE DRIVE
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
NESTLE PURINA. LOT 8
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
LOT 8 STATION
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In