Salem Oak Vineyardscharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily; for customer use only
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
169530
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Swedesboro, NJ
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Independent Electrical Services
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
DE TRANSIT CORP CRTC 4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Wawa Claymont #0854
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Claymont, DE - Philadelphia Pike Supercharger
Public - Membership Required
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Wawa - Tesla Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
WAWA
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Wawa
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
BURLINGTON LOGAN 3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In