Springfield Beckley Municipal Airportcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily Public - Credit card at all times
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
205509
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
kW power is an estimate based on the connection type
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Bryan Center
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
John Bryan Community Center
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
John Bryan Community Center - Tesla Destination
1
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Bryan Center
1
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
One Assurant Way #1
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
THE LAST QUEEN STATION1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public Parking Garage - Greenspot charging
Public
Operational
INSIDE CHARGER
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Cedarville University - Wood Hall
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In