OKCC OKCC PS1charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
ChargePoint http://www.chargepoint.net/ 1-408-841-4500
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
213480
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Johnson & Johnson Visitors Parking - North Building
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Johnson & Johnson Consumer Products
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
OKCC MUNICIPAL ST1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
PRINCETON VW
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
TENACRE CAMPUS TENACRE 1AND2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Meadows at Montgomery
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
STONEBRIDGE STONEBRIDGE
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
STONEBRIDGE
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
TENACRE CAMPUS TENACRE 5AND6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In