Mid-Hudson Library Systemcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
ViaLynk - Lynkwell https://lynkwell.com/
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
233102
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
County Office Building
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
City of Poughkeepsie - Duro Parking Lot
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
POUGHEEPSIE EV POUGHKEEPSIE 4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
POUGHEEPSIE EV POUGHKEEPSIE 3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
POUGHEEPSIE EV POUGHKEEPSIE 2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
WATERCLUB2582 GARAGE 2 CHARGE
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
WATERCLUB2582
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Walkway Over the Hudson
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Central Hudson Gas & Electric
Private - Restricted Access
Unknown
Level 1 : Low (Under 2kW)
NEMA 5-20R
Upload your own photos for this location: Sign In