Holiday Inn Utica (Burrstone Inn)charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
EV Connect https://www.evconnect.com/ 866) 816-7584
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
195713
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Slocum-Dickson Medical Group
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Utica University Welcome Center - Parking Lot
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Utica University Welcome Center - Upper Lot Garage
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Phaeton Motors
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
New Age Hotrods
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
STEET YORKVILLE STEET TOYOTA
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
National Grid - Utica
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
LeadCar Honda Yorkville
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
CARBONE SUBARU SHOP
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In