Monroe Community College - Lot Pcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily; employees only; 4 hour limit
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
226504
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Monroe Community College - Lot M
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
MONROE COUNTY MCC BR W2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Spark by Hilton - Brighton
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Country Inn & Suites by Radisson, Rochester Airport - Tesla Destination
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Country Inn & Suites By Radisson, Rochester Airport
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Holiday Inn Express Rochester - University Area
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Courtyard Rochester Brighton
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
RUSTIC VILLAGE CLUB HOUSE
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
RUSTIC VILLAGE
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In