Royale Chulan Cherating Villacharging location
Open to both Chalets and Villas guests. First B-Charge charging station installed in Malaysia. For Charging Instructions: Open GO TO-U app -> Profile -> About Our Service -> Charging Instrutions. Having Problems? Contact GO TO-U support staff via in-app 24/7 Support: Open GO TO-U app -> Profile -> Support 24/7 -> choose Whatsapp, Telegram, or Messenger.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
For Charging Instructions: Open GO TO-U app -> Profile -> About Our Service -> Charging Instrutions.
Go ToU https://go-tou.com
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Need to use GO TO-U app. Its also free charging.
Add your own comment/check-in for this location:
Sign InRating: 5 out of 5 [ General Comment , Charged Successfully ]For Charging Instructions: Open GO TO-U app -> Profile -> About Our Service -> Charging Instrutions. Having Problems? Contact GO TO-U support staff via in-app 24/7 Support: Open GO TO-U app -> Profile -> Support 24/7 -> choose Whatsapp, Telegram, or Messenger. Cost to charge: FOC but you need to be staying at the resort. 1 x 22 kW AC T2 socket
https://www.plugshare.com/location/468685 Comment by Azrin 02/27/2023 03:20:46
Other Charging Locations
There are 4 matching results
El Charge Cherating Lama
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
THE KASTURI RESORT CHERATING (Hotel)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Shell LPT 2 Perasing RNR
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Lebuhraya Pantai Timur
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)