GreenWay, Aupark Žilinacharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
V podzemnom parkovisku AUPARKu, prvé 2 parkovacie miesta hned vpravo po vjazde za rampou (miesta č. 105). Parkovanie je platené: Pracovné dni prvé tri hodiny 0€. Po prekročení troch hodín 3€ / deň https://www.auparkzilina.sk/obsah/parkovanie In AUPARK underground parking, first two park places on the right just after entry (behind the ramp, spot n.105). Parking is paid: Working days first three hours 0€. After three hours 3€ / day https://www.auparkzilina.sk/en/content/parking
Greenway https://greenway.sk +421 2 330 56 236
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
CCS (Type 2)
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
OC Mirage
2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
NISSAN Žilina
Private - Restricted Access
Unknown
Level 3: High (Over 40kW)
CHAdeMO
Hotel Holiday Inn Žilina
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
CEE 5 Pin
Tesco Hm Žilina
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
GreenWay, TESCO Žilina
2
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
ACHajik
1
3
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
CCS (Type 2)
Penzión Martinov Dvor
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
CEE 5 Pin
Pumpa VOMS
4
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
CEE 5 Pin
Chateau Gbelany
4
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Upload your own photos for this location: Sign In
Uploaded by veron on 2020-07-15
SK: Nová kombinovaná nabíjacia stanica (tu vidno CHAdeMO konektor). EN: New combined charging station (here you can see CHAdeMO plug).
Uploaded by Peter K. on 2015-10-12
SK: Nová kombinovaná nabíjacia stanica (tu vidno Mennekes a CCS konektory). EN: New combined charging station (here you can see Mennekes and CCS connectors).
Uploaded by Peter K. on 2015-10-12
Všimnite si trojfázovú zásuvku (spolu so zásuvkou na 230V) na stĺpe napravo od CHAdeMO nabíjačky. / Notice the location of 3 phase AC socket (together with 1 phase socket) mounted on the pillar on the right side of CHAdeMO charger.
Uploaded by Peter K. on 2015-03-27
The parking spot is reserved for electric cars. Charging/parking is allowed for maximum of 45 minutes.
Uploaded by Peter K. on 2015-03-27
Všimnite si trojfázovú zásuvku (spolu so zásuvkou na 230V) na stĺpe za CHAdeMO nabíjačkou. / Notice the location of 3 phase AC socket (together with 1 phase socket) mounted on the pillar behind CHAdeMO charger.
Uploaded by Peter K. on 2015-03-27
Uploaded by Peter K. on 2015-03-27