To edit, add comments or upload photos: Sign In
Parcheggio Multipiano interrato di Alleghecharging location
Nearest Address:
Via Lungo lago
Alleghe
BL
Italy
General Information:
4 prese per piano sui 3 piani del parcheggio MAX 16A per piano
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
3
Usage:
(Unknown)
Usage Cost:
free
Operational Status:
Operational
Latitude:
46.40533531753871
Longitude:
12.020238687799294
OCM Ref: OCM-24350
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Unknown Usage Type
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CEE 3 Pin
Unknown
3 Present
OCM-CN-26514
3.8 kW
AC (Single-Phase)
240 V
16 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Hotel Central
0.11 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel La Maison Wellness & SPA
1
4
0.97 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Ladestation Hotel Monte Civetta
2.22 Miles
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Selva di Cadore Centro | EnelX
3.2 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Albergo Lorenzini
3.26 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
POWY Via Marmolada
3.28 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ladestation Hotel Cesa Padon
1
5
5.95 Miles
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Albergo Ristorante La Baita
1
6.39 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ladestation Hotel Belvedere
8.33 Miles
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)