City of Pasadena - Schoolhouse Garagecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily; pay lot
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
6507
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - Has recent user verification
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Unknown
Type 1 (J1772)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Shopcore One Colorado (Pasadena, CA)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
City of Pasadena - De Lacey Garage
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
177ECOLORADO
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
City of Pasadena - Marengo Garage
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Pasadena, Ca Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Marengo Garage - Tesla Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
City of Pasadena - Del Mar Station
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
City of Pasadena - Holly Street Garage
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Wescom Credit Union
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In