Aecon Construction Group Inccharging location
Planned for future date. Not Operational.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
249444
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Alectra Energy Services - Mayfield Secondary School
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Sandalwood Heights Secondary School
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
City of Brampton - Springdale Library
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Brampton - Springdale Library - Komagata Maru Park
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Mercedes-Benz - Brampton
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
PHM STATION
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
PERFORMANCE HON MAYFIELD S1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
STATION CT4000
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
STATION CPE100
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Upload your own photos for this location: Sign In