Regional Municipality of Durhamcharging location
Planned for future date. Not Operational.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
249524
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Darlington Site WTL
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Regional Municipality of Durham
Private - Restricted Access
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Roy Nichols Motors Limited 2
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
METRO - Courtice Store
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Courtice Community Complex
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Metro Ontario
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
PETRO-CANADA 10486 - 2
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Petro-Canada - Bowmanville
Public - Pay At Location
Not Operational
Level 3: High (Over 40kW)
CHAdeMO
Garnet B. Rickard Recreation Complex
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In