292 Main Street Developments Limitedcharging location
Planned for future date. Not Operational.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
250371
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Acadia Athletics Complex
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Governors of Acadia University
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
OLD ORCHARD INN STATION 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Grand Pré National Historic Site
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Grand-Pré - Parking Lot - Tesla Destination
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Just Us! Coffee
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
SERVICE FRONT25 DC FAST 1
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Forbes Kia
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Irving New Minas Big Stop - Tesla Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Upload your own photos for this location: Sign In