Parkland Corpcharging location
Planned for future date. Not Operational.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
255041
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
kW power is an estimate based on the connection type
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
On the Run EV Fast Charge
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
On the Run
1
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
SWTCH Energy
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
MISSION GROUP U5 STATION
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Goode Properties - 710-730 Stremel Rd
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ORCHARD FORD EXPP PL2
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
ORCHARD FORD OF CUST PARK
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
MISSION GROUP
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
MISSION GROUP UTHREESTATION 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In