Half Hitch Brewing Cocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily; for guest use only
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
84034
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Half Hitch Brewing Company
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
MAINPARKING2025 STATION 22924
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Innovation-Transit Hub Parking Lot
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Cochrane Motors 2
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CANALTACOCHRANE CANALTA 2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Cochrane Dodge - SmartDC
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Shell Canada
Private - Restricted Access
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 1)
Petro Canada 42148 AB-1
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
PETRO-CANADA 85527 - 2
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In