Фортунаcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
РусГидро (Russia) https://www.rushydro.ru/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
CEE 7/4 - Schuko - Type F
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Авторынок "Автомолл"
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
En+, Сухэ-Батора
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
улица Баррикад
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CHAdeMO
En+, Фучика
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Иркутск Байкальская 25А
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Иркутск Култукская
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
En+, Верхняя Набережная
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Иркутск Терешковой
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
СБЕР Пискунова
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In