Ewiva AdS Monte Baldo Estcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Ewiva (IT) https://ewiva.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]Un solo cavo da 100 kW presso il benzinaio, che funziona benissimo ma è un po' poco considerando che siamo in autostrada. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enel-x-way-evviva-100kw-a4-direzione-venezia-area-di-servizio-monte-baldo-est-t30898.html
https://www.forumelettrico.it/forum/colonnina-enel-x-way-evviva-100kw-a4-direzione-venezia-area-di-servizio-monte-baldo-est-t30898.html Comment by ForumElettrico.it 07/12/2025 06:40:11
Other Charging Locations
There are 9 matching results
Allego Tamoil
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Impianti Sportivi Sommacampagna | EnelX
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Caselle Piazza dei Donatori | EnelX
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Saccardi & Spa
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
EnelX EVA+ Municipio di Sommacampagna
4
12
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Q8 Caselle
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Electrip La Grande Mela Lugagnano
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Aeroporto di Verona Catullo - Parcheggio Sosta breve partenze/arrivi
(Unknown)
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Eni
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-07-12
Uploaded by ForumElettrico.it on 2025-07-12
Uploaded by ForumElettrico.it on 2025-07-12