To edit, add comments or upload photos: Sign In
PLN ULP Bogor Baratcharging location
Nearest Address:
PLN ULP Bogor Barat, Jl Kemang
Bogor
Jawa Barat
16310
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Usage Cost:
Rp2467/kWh
Operational Status:
Operational
Latitude:
-6.5159599
Longitude:
106.756784
OCM Ref: OCM-260709
Network/Operator
PLN (Indonesia) https://web.pln.co.id/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-438881
22 kW
AC (Three-Phase)
CCS (Type 2)
Operational
2 Present
OCM-CN-804517
60 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Greenland Bogor
1.06 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
RS Sentosa
1.5 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Hyundai Sholeh Iskandar
2.03 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
(Daya Green) Bogor Great Mall
(Daya Green) Bogor Great Mall, Jl KH.R.abdullah Bin Nuh
Tanah Sareal
Bogor
Jawa Barat
16113
Indonesia
View
3.09 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(HVT) Cherry Avante Bogor
3.74 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PLN ULP Bojonggede
4.18 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Hexing Teras Teh Popi
4.24 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
McDonald's Cibinong
4.78 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Q Square Bogor
5.24 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In