To edit, add comments or upload photos: Sign In
PLN ULP Cibinongcharging location
Nearest Address:
Jl. Raya Mayor Oking Jaya Atmaja No.KM.2, Ciriung, Kec. Cibinong
Bogor
Jawa Barat
16918
Indonesia
Number Of Stations/Bays:
1
Usage:
Public - Pay At Location
Usage Cost:
Rp2467/kWh
Operational Status:
Operational
Latitude:
-6.467145646472645
Longitude:
106.86097190568626
OCM Ref: OCM-260713
Network/Operator
PLN (Indonesia) https://web.pln.co.id/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-438886
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
SPKLU Voksel Taman Panas Dingin
2.23 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
SPKLU ULP Citereup
2.52 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLN ULP Citeureup
Jl. Raya Cileungsi - Jonggol No.KM, RW.1, Cileungsi Kidul, Kec. Cileungsi
Bogor
Jawa Barat
16820
Indonesia
View
2.52 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Perumahan Bumi Sentosa
3 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
McDonald's Cibinong
3.15 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Rest Area KM 21 B Tol Jagorawi
3.17 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
HVT Podomoro Golf View
3.36 Miles
Public - Pay At Location
Operational
Level 1 : Low (Under 2kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 1 : Low (Under 2kW)
CCS (Type 2)
BSpace GDC
3.4 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PLN ULP Bojonggede
3.99 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In