To edit, add comments or upload photos: Sign In
Gyllene Uttern ACcharging location
Nearest Address:
Gyllene Uttern 1
GRÄNNA
JÖNKÖPING
56392
Sweden
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
18
Latitude:
57.99563
Longitude:
14.43943
OCM Ref: OCM-261465
Data Provider:
NOBIL https://nobil.no/
Data License:
NOBIL by Enova is licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) License.
Providers Ref:
14279
Data Quality Report
Data Quality Score: 50 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Unknown Usage Type
- Data Completeness - Unknown Operational Status
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Status Unknown
OCM-CN-441964
22 kW
AC (Three-Phase)
400 V
32 A
Mode 3
Type 2 (Socket Only)
Status Unknown
OCM-CN-441965
22 kW
AC (Three-Phase)
400 V
32 A
Mode 3
Type 2 (Socket Only)
Status Unknown
OCM-CN-441966
22 kW
AC (Three-Phase)
400 V
32 A
Mode 3
Type 2 (Socket Only)
Status Unknown
OCM-CN-441967
22 kW
AC (Three-Phase)
400 V
32 A
Mode 3
Type 2 (Socket Only)
Status Unknown
OCM-CN-441968
22 kW
AC (Three-Phase)
400 V
32 A
Mode 3
Type 2 (Socket Only)
Status Unknown
OCM-CN-441969
22 kW
AC (Three-Phase)
400 V
32 A
Mode 3
Type 2 (Socket Only)
Status Unknown
OCM-CN-441970
22 kW
AC (Three-Phase)
400 V
32 A
Mode 3
Type 2 (Socket Only)
Status Unknown
OCM-CN-441971
22 kW
AC (Three-Phase)
400 V
32 A
Mode 3
Type 2 (Socket Only)
Status Unknown
OCM-CN-441972
22 kW
AC (Three-Phase)
400 V
32 A
Mode 3
Type 2 (Socket Only)
Status Unknown
OCM-CN-441973
22 kW
AC (Three-Phase)
400 V
32 A
Mode 3
Type 2 (Socket Only)
Status Unknown
OCM-CN-441974
22 kW
AC (Three-Phase)
400 V
32 A
Mode 3
Type 2 (Socket Only)
Status Unknown
OCM-CN-441975
22 kW
AC (Three-Phase)
400 V
32 A
Mode 3
Type 2 (Socket Only)
Status Unknown
OCM-CN-441976
22 kW
AC (Three-Phase)
400 V
32 A
Mode 3
Type 2 (Socket Only)
Status Unknown
OCM-CN-441977
22 kW
AC (Three-Phase)
400 V
32 A
Mode 3
Type 2 (Socket Only)
Status Unknown
OCM-CN-441978
22 kW
AC (Three-Phase)
400 V
32 A
Mode 3
Type 2 (Socket Only)
Status Unknown
OCM-CN-441979
22 kW
AC (Three-Phase)
400 V
32 A
Mode 3
Type 2 (Socket Only)
Status Unknown
OCM-CN-441980
22 kW
AC (Three-Phase)
400 V
32 A
Mode 3
Type 2 (Socket Only)
Status Unknown
OCM-CN-441981
22 kW
AC (Three-Phase)
400 V
32 A
Mode 3
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Gyllene Uttern DC - ChargeNode
0.04 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CCS (Type 2)
Ionity Gränna
0.57 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Sjögatan 31
2.14 Miles
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
HEMSÖ Vårdträdet 7
2.36 Miles
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Gränna Padel
2.38 Miles
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Preem Brahehus - E.ON
4.62 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Preem Gränna
4.63 Miles
Level 3: High (Over 40kW)
CHAdeMO
Level 3: High (Over 40kW)
CHAdeMO
Brahehus - Mer
4.63 Miles
Level 2 : Medium (Over 2kW)
CCS (Type 2)
Level 2 : Medium (Over 2kW)
CCS (Type 2)
Tempelgården
5.87 Miles
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In