GM - TROY-ALAN CHEVROLET BUICK GMCcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
EV Connect https://www.evconnect.com/ 866) 816-7584
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
259590
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
LOVE'S 731 - PA #731 DC1
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
LOVE'S 731 - PA #731 DC2
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Jennings Environmental Education Center - Main Lot
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Main Street Diner
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Main Street Diner - Tesla Destination
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Sheetz - Tesla Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Grove City, Pa Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Moraine State Park
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Hampton Inn & Suites Grove City
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Upload your own photos for this location: Sign In