To edit, add comments or upload photos: Sign In
Rest Area KM 229 B Tol Kanci - Pejagancharging location
Nearest Address:
Rest Area KM 229 B Tol Kanci - Pejagan
Cirebon
Jawa Barat
45191
Indonesia
Number Of Stations/Bays:
26
Usage:
Public
Usage Cost:
IDR 2467/Kwh
Operational Status:
Operational
Latitude:
-6.8847187
Longitude:
108.7070833
OCM Ref: OCM-270804
Network/Operator
PLN (Indonesia) https://web.pln.co.id/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - Has recent user verification
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Temporarily Unavailable
1 Present
OCM-CN-803050
50 kW
DC
CHAdeMO
Temporarily Unavailable
1 Present
OCM-CN-803051
50 kW
DC
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-803052
22 kW
AC (Three-Phase)
CCS (Type 2)
Operational
2 Present
OCM-CN-803053
200 kW
DC
CCS (Type 2)
Operational
1 Present
OCM-CN-803054
25 kW
DC
CCS (Type 2)
Operational
2 Present
OCM-CN-803055
120 kW
DC
CCS (Type 2)
Operational
2 Present
OCM-CN-803056
120 kW
DC
CCS (Type 2)
Operational
2 Present
OCM-CN-803057
60 kW
DC
CCS (Type 2)
Operational
2 Present
OCM-CN-803058
60 kW
DC
CCS (Type 2)
Operational
2 Present
OCM-CN-803059
120 kW
DC
CCS (Type 2)
Operational
2 Present
OCM-CN-803060
180 kW
DC
CCS (Type 2)
Operational
2 Present
OCM-CN-803061
120 kW
DC
CCS (Type 2)
Operational
2 Present
OCM-CN-803062
180 kW
DC
CCS (Type 2)
Operational
2 Present
OCM-CN-803063
120 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Rest Area KM 228 A Tol Kanci - Pejagan
0.35 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLN ULP Ciledug
3.29 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Posko Sindang Laut
6.9 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Rest Area KM 208 B Cirebon Tol Palimanan - Kanci
12.08 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Rest Area KM 207 A Cirebon, Tol Palimanan - Kanci
12.46 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Rest Area KM 207 A Cirebon Tol Palimanan - Kanci
12.47 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Rest Area KM 252 A Tol Pejagan - Pemalang
14.35 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PLN ULP Cilimus
14.49 Miles
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
PLN ULP Cirebon Kota
14.61 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)