To edit, add comments or upload photos: Sign In
Mälarenergi STOP 128 - ChargeNodecharging location
Nearest Address:
Speditörgatan 1
VÄSTERÅS
VÄSTMANLAND
72476
Sweden
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
2
Latitude:
59.59673
Longitude:
16.43588
OCM Ref: OCM-272204
Access Information:
59.59672921332578, 16.43588238216515
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 50 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Unknown Usage Type
- Data Completeness - Unknown Operational Status
- Data Completeness - Equipment Details Present
CCS (Type 2)
Status Unknown
2 Present
OCM-CN-465455
350 kW
DC
Mode 3
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Recharge IKEA Västerås
0.94 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CCS (Type 2)
Bäckby Centrum
1.38 Miles
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Erikslund, Laddregion Mälardalen - EVcore
1.38 Miles
Level 2 : Medium (Over 2kW)
CCS (Type 2)
Level 2 : Medium (Over 2kW)
CCS (Type 2)
ICA Blomlager Västerås
1.41 Miles
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Laddstation Bauhaus Västerås
1.43 Miles
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Vattenfall - Traversgatan 4
1.6 Miles
Level 3: High (Over 40kW)
CHAdeMO
Level 3: High (Over 40kW)
CHAdeMO
ICA lager Hacksta
1.64 Miles
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Mälarenergi ICA Maxi Erikslund - ChargeNode
1.74 Miles
Unknown
Level 3: High (Over 40kW)
CHAdeMO
Unknown
Level 3: High (Over 40kW)
CHAdeMO
Allego SHF Västerås
1.76 Miles
Level 2 : Medium (Over 2kW)
CCS (Type 2)
Level 2 : Medium (Over 2kW)
CCS (Type 2)
Upload your own photos for this location: Sign In