Be Charge charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]In pochi minuti a piedi troviamo un paio di bar, pizzeria e servizi di vario tipo. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-be-charge-ultra-fast-bologna-bo-via-alberto-dallolio-10-t37131.html
https://www.forumelettrico.it/forum/colonnina-be-charge-ultra-fast-bologna-bo-via-alberto-dallolio-10-t37131.html Comment by ForumElettrico.it 04/27/2024 15:51:03
Other Charging Locations
There are 9 matching results
Volkswagen Via Caduti e Dispersi in Guerra
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Parco dei Cedri
1
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Eni
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
4 Via Faenza | Hera
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
San Lazzaro di Savena Repubblica | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BOLOGNA Giardino Rosa BECHARGE
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parco 2 Agosto
2
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
SAN LAZZARO DI SAVENA Bellaria | ENELX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bowling San Lazzaro
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2024-04-27
Uploaded by ForumElettrico.it on 2024-04-27
Uploaded by ForumElettrico.it on 2024-04-27
Uploaded by ForumElettrico.it on 2024-04-27
Uploaded by ForumElettrico.it on 2024-04-27