EVsmart - BGE - Ateaze Senior Centercharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily Public - Credit card at all times
SWTCH - Charge Everywhere https://charge.swtchenergy.com/ +1-844-798-2438
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
306392
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
MERRITT 702 STATION 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CONSTELLATIONMC
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Bob Bell Nissan
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
BMW BALTIMORE
Public
Level 3: High (Over 40kW)
CCS (Type 1)
First United Evangelical and Reformed Church
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
EVsmart - BGE - Sollers Point
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Best Western Hotel and Conference Center
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Best Western Hotel and Conference Center
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Back River Treatment Plant
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In