Be Charge Municipiocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Dotata di due connettori CCS Combo 2 ed un Tipo 2, in centro del paese. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/collonina-be-charge-pieris-go-t24794.html
https://www.forumelettrico.it/forum/collonina-be-charge-pieris-go-t24794.html Comment by ForumElettrico.it 09/28/2023 05:15:29
Other Charging Locations
There are 9 matching results
Pieris Gomme
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Via Venticinque Aprile
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Piazza donatori del sangue
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Aeroporto Ronchi dei Legionari P3 | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX Fast EVA+ Aeroporto di Trieste - Parcheggio P4
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Aeroporto Friuli Venezia Giulia
1
2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BCC Starville
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Bennet
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ewiva Nord Est Mall
1
4
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-09-28
Uploaded by ForumElettrico.it on 2023-09-28
Uploaded by ForumElettrico.it on 2023-09-28