C.C. Plaza Loranca 2charging location
payment with credit card / apps
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Electra https://www.go-electra.com
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Five Hypercharger HYC400 DC chargers that allows charging one vehicle at 400kW, or two simultaneous charges at 200kW. (max power is limited to 200kW for 400V cars)
CHAdeMO
Hypercharger HYC400 DC charger
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Centro Comercial Loranca (Parking Exterior)
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
C.C. Plaza Loranca 2 (Parking Interior)
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tesla Supercharger Fuenlabrada (Service Center)
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ballenoil Fuenlabrada IV
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Repuestos Reyes (Fuenlabrada)
1
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Nexum Fuenlabrada
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Mercadona Babilonia
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Mercadona Calle de Móstoles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Sport Padel Center S7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)