Be Charge charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Posta appena fuori la ZTL che è all'inizio di via Bocca di Lupo, ottima per il centro ma con parcheggi un po' stretti per via dei paletti. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-bologna-bo-via-castelfidargo-ang-via-bocca-di-lupo-t30768.html
https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-bologna-bo-via-castelfidargo-ang-via-bocca-di-lupo-t30768.html Comment by ForumElettrico.it 12/03/2023 15:48:34
Other Charging Locations
There are 9 matching results
Eneldrive Corte d'Appello
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Rubbiani
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Prefettura di Bologna
2
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Foscolo
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Basilica di San Francesco
2
9
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Universita' di Bologna | EnelX
1
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Istituto Ortopedico Rizzoli
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bologna Codivilla | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Santa Maria Delle Visitazione al ponte delle Lame
3
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-12-03
Uploaded by ForumElettrico.it on 2023-12-03
Uploaded by ForumElettrico.it on 2023-12-03
Uploaded by ForumElettrico.it on 2023-12-03
Uploaded by ForumElettrico.it on 2023-12-03
Uploaded by ForumElettrico.it on 2023-12-03
Uploaded by ForumElettrico.it on 2023-12-03