Lake Lorna Doone Park - Westcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
ChargeUp (NovaCharge) https://chargeupev.com/
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
313929
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Citrus Bowl
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
OUC CITRUS BOWL 01
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Lake Lorna Doone Park - East
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
John H Jackson Community Center
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Orlando Soccer Stadium - Exploria
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Callahan Community Center
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
UCF - Downtown Parking Garage
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
DRESI 1221 COLONIAL
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
DRESI
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In