SANTA CLARITA CPSTAIRS #1charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Mon: 6:00am-10:00pm; Tue: 6:00am-10:00pm; Wed: 6:00am-10:00pm; Thu: 6:00am-10:00pm; Fri: 6:00am-10:00pm; Sat: 6:00am-10:00pm; Sun: 6:00am-10:00pm
ChargePoint http://www.chargepoint.net/ 1-408-841-4500
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
316092
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
SANTA CLARITA CENTRAL PARK
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
SANTA CLARITA
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
SANTA CLARITA RIVER TRAILHEAD
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Soledad MetroLink Train Station
Public
Temporarily Unavailable
Level 3: High (Over 40kW)
CHAdeMO
MBV CT4023 #1 MBV-SPRNT1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
William S. Hart UHSD
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Bridgeport Marketplace
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Bridgeport Marketplace
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
AUTONATION CHEV
Public
Level 3: High (Over 40kW)
CCS (Type 1)
Upload your own photos for this location: Sign In