Colorado State University - Rockwell Hallcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily; permit or daily parking fee required
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
61341
Data Quality Report
Data Quality Score: 60 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Unknown Operational Status
- Data Completeness - Equipment Details Present
Type 1 (J1772)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
COLO STATE UNIV SPRUCE HALL 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Brendle Group, Inc
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
COLO STATE UNIV USC 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
COLO STATE UNIV
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Poudre Valley Hospital
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
FORT COLLINS
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
COLO STATE UNIV SOUTH COLLEGE 3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
In-Situ
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
FORT COLLINS FIREHOUSE ALLEY
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In