Adanero Rest. MA (Wenea)charging location
Max charging power currently limited to 60kW
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Wenea http://www.wenea.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
PowerElectronics NB240 charger (500A peak). Power is split between both outlets. The DC charger allows charging one vehicle at 220kW, or two simultaneous charges at 110kW.
CCS (Type 2)
PowerElectronics NB240 charger (500A peak).
Other Charging Locations
There are 9 matching results
REPSOL Espinosa de Los Caballeros
1
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ayunt. Tiñosillos
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Galp Arevalo
1
Public - Membership Required
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel Span Villareal
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ayunt. Arévalo
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
E.S. Beroil Arévlo
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
E.S. Valcarce (Iberdrola)
1
2
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
A.S. Las Fuentes
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Espacio Natural Laguna Del Oso KERBEST
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)