Powy Zona PIPcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
POWY https://powy.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Situata in una zona industriale: accanto c'è un supermercato ed il primo bar sta ad oltre 10 minuti a piedi, come anche il centro storico del paese. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-powy-fast-carpignano-salentino-le-via-i-maggio-t35360.html
https://www.forumelettrico.it/forum/colonnina-powy-fast-carpignano-salentino-le-via-i-maggio-t35360.html Comment by ForumElettrico.it 01/01/2024 16:09:19
Other Charging Locations
There are 9 matching results
Melpignano Castrignano | EnelX
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Melpignano Rimembranze | EnelX
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Municipio di Melpignano | EnelX
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Istituto Comprensivo
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Melpignano Libertà | EnelX
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Concessionario Nissan AB Auto S.p.A
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Stazione Corigliano d'Otranto | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
CORIGLIANO D'OTRANTO de Gasperi | ENELX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Q8
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2024-01-01
Uploaded by ForumElettrico.it on 2024-01-01
Uploaded by ForumElettrico.it on 2024-01-01
Uploaded by ForumElettrico.it on 2024-01-01
Uploaded by ForumElettrico.it on 2024-01-01