PDR Barbera parccharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
GALP Electric https://www.galp.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
HelloNext H2-120 Charger. The DC charger allows charging one vehicle at 120kW, or two simultaneous charges at 60kW. Maximum amperage 200A (max power is limited to 80kW for 400V cars)
Type 2 (Socket Only)
Other Charging Locations
There are 9 matching results
PDR PK5 Baricentro
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Hotel Campanille (Iberdrola)
2
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PDR PK6 Baricentro
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
PDR PK4 Rapido Baricentro
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
C.C Baricentro
10
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
PDR PK3 Baricentro
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
PDR PK4 Baricentro
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
EdRR AMB Barbera del valles
12
3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Petro Low cost Barberá del Vallés
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)