To edit, add comments or upload photos: Sign In
SW Salem Högvreten ABcharging location
Nearest Address:
Söderby Gårds väg 75
RÖNNINGE
STOCKHOLM
14451
Sweden
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
1
Operational Status:
Unknown
Latitude:
59.202412
Longitude:
17.781633
OCM Ref: OCM-292941
Data Provider:
NOBIL https://nobil.no/
Data License:
NOBIL by Enova is licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) License.
Providers Ref:
19805
Data Quality Report
Data Quality Score: 50 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Unknown Usage Type
- Data Completeness - Unknown Operational Status
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Status Unknown
OCM-CN-522757
22 kW
AC (Three-Phase)
400 V
32 A
Mode 3
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Centralvägen -
1.34 Miles
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tumba Centrum
1.83 Miles
Level 2 : Medium (Over 2kW)
Unknown
Level 2 : Medium (Over 2kW)
Unknown
SE_LS4_1681
3.01 Miles
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
MAX Brunnavägen - InCharge
3.4 Miles
Unknown
Level 3: High (Over 40kW)
CCS (Type 2)
Unknown
Level 3: High (Over 40kW)
CCS (Type 2)
Kundparkering på ICA Maxi
3.91 Miles
Level 2 : Medium (Over 2kW)
Unknown
Level 2 : Medium (Over 2kW)
Unknown
ICA Maxi Moraberg
3.96 Miles
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tesla Supercharger Moraberg
4.19 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
MAX Fågelviksvägen - InCharge
4.36 Miles
Level 3: High (Over 40kW)
CCS (Type 2)
Level 3: High (Over 40kW)
CCS (Type 2)
IONITY Södertälje
5.26 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In