Miller EVIDCcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
EV Connect https://www.evconnect.com/ 866) 816-7584
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
327027
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 1)
kW power is an estimate based on the connection type
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
EV Experience Center Level 3
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
EV Experience Center level 2
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CHARGEPOINT JAX CHARGEPOINT IDC
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Miller Electric Company
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Miller Electric HQ - Atom Power EV-Charging
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Miller Electric Company - Tesla Destination
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Miller Electric
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
The Crossing at Enterprise Park
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
ACP MONTESSORI
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In