County Commissioners Administrative Buildingcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
EV Connect https://www.evconnect.com/ 866) 816-7584
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
328170
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
County Commissioners Administrative Building
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
SKAGIT COUNTY ADMIN STATION 2
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Mount Vernon Plaza
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Riverside Lanes - Mt. Vernon
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
SKAGITYMCA TWO
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Skagit Valley College - Lewis Hall
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Skagit Valley College
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
SKAGITYMCA THREE
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Skagit Valley College - Annex
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In