Enel X Way charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Di fronte abbiamo un bar ed una pizzeria, che però alla domenica sono chiusi: altri bar sono comunque raggiungibili entro 10 minuti a piedi. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enel-x-way-fast-bologna-bo-via-dell-arcoveggio-48-t36350.html
https://www.forumelettrico.it/forum/colonnina-enel-x-way-fast-bologna-bo-via-dell-arcoveggio-48-t36350.html Comment by ForumElettrico.it 03/05/2024 13:39:04
Other Charging Locations
There are 9 matching results
Be Charge Bolognina
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Museo del Patrimonio Industriale | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Zona Sportiva Arcoveggio | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX EVAD Enel Spa BO
2
10
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bologna Gobetti | EnelX
1
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Parco della Zucca Bolognina
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive sede tper
2
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bologna Fioravanti | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Lidl Bologna Corticella
3
5
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2024-03-05
Uploaded by ForumElettrico.it on 2024-03-05
Uploaded by ForumElettrico.it on 2024-03-05
Uploaded by ForumElettrico.it on 2024-03-05
Uploaded by ForumElettrico.it on 2024-03-05