Tesla Supercharger Puebla de Sanabriacharging location
8 V4 Superchargers 250kW (CCS). Max total power of the station 750kW
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Tesla (including non-tesla) https://www.tesla.com/en_AU/support/non-tesla-supercharging
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Hotel Meleiros (Zunder)
3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Avenida del Padre Vicente Salgado
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Casa del Parque I Lago de Sanabria (Moveletur)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Efiduero Ayunt. Requejo
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Casa del Parque - Centro Temático del Lobo (Moveletur)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Efiduero Ayunt. Peña Linarejos
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Efiduero Ayunt. Manzanal de Arriba
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Efiduero Ayunt. Lubián
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Efiduero Ayunt. Hermisende
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)