To edit, add comments or upload photos: Sign In
Plenoil Alcalá de Henares Icharging location
Nearest Address:
Avenida de Madrid
Comunidad de Madrid
28802
Spain
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Usage Cost:
0,30€/kWh
Operational Status:
Operational
Latitude:
40.47445805261788
Longitude:
-3.400846902879266
OCM Ref: OCM-300331
Network/Operator
Plenoil (ES) https://plenoil.es/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-559034
60 kW
DC
950 V
150 A
SuperFloox 60 Charger. The DC charger allows charging one vehicle at 60kW, or two simultaneous charges at 30kW.
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Pol. Las Matillas
1
0.07 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
El Corte Inglés Alcalá Henares
1
2
0.38 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
REPSOL Alcalá de Henares II
1
0.42 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel Ibis Alcala de Henares la Garena
0.44 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Repsol Alcalá Bricor
1
0.45 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Garena Plaza
0.58 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BP Pulse Avenida de Juan Carlos I
1
0.58 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Campanile Madrid - Alcalá de Henares
0.6 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
REPSOL Alcalá de Henares
0.68 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)