To edit, add comments or upload photos: Sign In
E.S. RBcharging location
Nearest Address:
C-531
Galicia
36616
Spain
Number Of Stations/Bays:
2
Usage:
Public - Pay At Location
Usage Cost:
0,52€/kWh
Operational Status:
Operational
Latitude:
42.513572953824166
Longitude:
-8.678025383143478
OCM Ref: OCM-300537
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
2 Present
OCM-CN-559530
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Parque Maquinaria Barro
0.36 Miles
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Rural El Abuelo Arcos
1.22 Miles
Private - For Staff, Visitors or Customers
Operational
Level 1 : Low (Under 2kW)
CEE 7/4 - Schuko - Type F
Private - For Staff, Visitors or Customers
Operational
Level 1 : Low (Under 2kW)
CEE 7/4 - Schuko - Type F
Mosteiro
1.27 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
E.S. Salnes
3.46 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
E.S. Campaño
1
3.64 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
ARMENTEIRA Pontevedra
4.5 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Plenoil Vilanoba II
4.6 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Portas Rapeira
1
4.66 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Barrantes
4.68 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)