To edit, add comments or upload photos: Sign In
Castro de Reycharging location
Nearest Address:
Praza García Abad
Castro Ribeiras do Lea
Galicia
27260
Spain
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Usage Cost:
Operational Status:
Planned For Future Date
Latitude:
43.13965261389245
Longitude:
-7.494285986666824
OCM Ref: OCM-300623
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-559663
60 kW
DC
400 V
150 A
Wallbox Supernova 60 Charger. The DC charger allows charging one vehicle at 60kW, or two simultaneous charges at 30kW
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Repsol Castro Riberas
1
0.19 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ferreira
1
4.47 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Outeiro de Rei (Zunder)
2
6.01 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Rest. A Palloza
1
6.19 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Motel Paraiso
1
6.49 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Outeiro De Rei
1
6.55 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
CAPSA LUGO
6.81 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Gasóleos Ceao
1
6.98 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Repsol Benigno Rivera
1
7.1 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)