To edit, add comments or upload photos: Sign In
Supermercado La Despensacharging location
Nearest Address:
Calle San Lorenzo
Mora
Castilla-La Mancha
45400
Spain
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
2
Usage:
Public
Usage Cost:
Operational Status:
Operational
Latitude:
39.68316176486536
Longitude:
-3.7712743052976805
OCM Ref: OCM-301060
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
2 Present
OCM-CN-561713
7.4 kW
AC (Single-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Gasolinera Hnos. Fernández Garcia
2
0.4 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ahorramas Mora
0.59 Miles
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
E.S. Repsol Mora
1
3.49 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ayunt. Orgaz (Acciona)
5.85 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
AhorraMas - Los Yébenes
8.51 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Turleque (Acciona)
10.24 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Mercadona Sonseca
10.65 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ahorramas Sonseca
10.69 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Mazarambroz (Acciona)
1
13.11 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In