EKO Point Garbagnatecharging location
Utilizzabile solo durante gli orari in cui è presente il gestore.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
CHAdeMO
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok! Maggiori info qui: http://www.forumelettrico.it/forum/colonnina-eko-point-in-via-trattati-di-roma-garbagnate-milanese-mi-t428.html
Comment by ForumElettrico.it 09/23/2016 17:42:52
Other Charging Locations
There are 9 matching results
Centro Commeciale Il Centro - Stazione D
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Centro Commeciale Il Centro - Stazione B
2
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX EVA+ Lainate
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ewiva La Pista Lainate
1
2
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Iper Station Arese
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Centro Commeciale Il Centro - Stazione C
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Supercharger Arese disponibile per i veicoli non Tesla
2
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
CC Il Centro Arese
Public
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Centro Commeciale Il Centro - Stazione A
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2016-09-23
Uploaded by polianto on 2015-09-18
Uploaded by polianto on 2015-09-18