Be Charge Rovercentercharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Accanto troviamo il centro commerciale dotato di bagni liberamente accessibili, bar, ristorante pizzeria e diversi negozi. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-be-charge-ultra-fast-rovercenter-rovereto-tn-viale-del-lavoro-18-t38693.html
https://www.forumelettrico.it/forum/colonnina-be-charge-ultra-fast-rovercenter-rovereto-tn-viale-del-lavoro-18-t38693.html Comment by ForumElettrico.it 08/16/2024 06:11:48
Other Charging Locations
There are 9 matching results
Supercharger Tesla Rovereto
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Via Fiume
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Progetto Manifattura - route220
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Casello Rovereto Sud A22
3
11
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Piazza Leoni Rovereto | Neogy
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Via Paoli Rovereto | Neogy
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Neogy Fast Via Antonio Gazzoletti
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Via Giovanni Battista Miori
Private - For Staff, Visitors or Customers
Operational
Level 1 : Low (Under 2kW)
SCAME Type 3C (Schneider-Legrand)
MART Rovereto | Neogy
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2024-08-16
Uploaded by ForumElettrico.it on 2024-08-16
Uploaded by ForumElettrico.it on 2024-08-16
Uploaded by ForumElettrico.it on 2024-08-16
Uploaded by ForumElettrico.it on 2024-08-16