Be Charge Rovercentercharging location

This charging location has not been recently verified and you should not rely solely on this information for journeys.

If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.

If the details are inaccurate please edit them.

Number Of Stations/Bays: 1
Usage: Public
Usage Cost: € 0.46/kWh except peak hours 16:00-20:00 at € 0,50/kWh
Operational Status: Operational
Latitude: 45.863955
Longitude: 11.027526
OCM Ref: OCM-303014
Network/Operator

Be Charge (Italy) https://www.bec.energy/

Data Provider:

Open Charge Map Contributors http://openchargemap.org

Data License:

Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report


Data Quality Score: 90 out of 100
  •   User Feedback - No recent user verification.
  •   User Feedback - Has comments or check-ins
  •   User Feedback - Has photos
  •   Data Completeness - Usage Type Known
  •   Data Completeness - Operational Status Known
  •   Data Completeness - Equipment Details Present

CCS (Type 2)

Status Unknown
2 Present
OCM-CN-569744
110 kW DC

Type 2 (Tethered Connector)

Status Unknown
1 Present
OCM-CN-569745
22 kW AC (Three-Phase)

Add your own comment/check-in for this location:

Sign In
[ General Comment , Charged Successfully ]

Accanto troviamo il centro commerciale dotato di bagni liberamente accessibili, bar, ristorante pizzeria e diversi negozi. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-be-charge-ultra-fast-rovercenter-rovereto-tn-viale-del-lavoro-18-t38693.html

https://www.forumelettrico.it/forum/colonnina-be-charge-ultra-fast-rovercenter-rovereto-tn-viale-del-lavoro-18-t38693.html Comment by ForumElettrico.it 08/16/2024 06:11:48

Other Charging Locations

There are 9 matching results

Supercharger Tesla Rovereto
 

Hotel nerocubo
via per marco 16
Rovereto
Italy
View
1.34 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Via Fiume
 

Via Fiume 33
Rovereto
Trentino-Alto Adige/Südtirol
38068
Italy
View
1.35 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Progetto Manifattura - route220
 

Piazza Manifattura 1
Rovereto
TN
38068
Italy
View
1.4 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Casello Rovereto Sud A22
3   11

Via S. Romedio, 61
Marco
TN
38065
Italy
View
1.64 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO

Piazza Leoni Rovereto | Neogy
 

Piazza Achille Leoni
Rovereto
Trento
38068
Italy
View
1.76 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Via Paoli Rovereto | Neogy
 

Via Francesco Paoli 12
Rovereto
Trento
38068
Italy
View
2.01 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Neogy Fast Via Antonio Gazzoletti
 

Via Antonio Gazzoletti
Rovereto
Trentino-Alto Adige - Südtirol
38068
Italy
View
2.13 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Via Giovanni Battista Miori
 

Via Giovanni Battista Miori
Isera
Provincia autonoma di Trento
38068
Italy
View
2.17 Miles
Private - For Staff, Visitors or Customers
Operational
Level 1 : Low (Under 2kW)
SCAME Type 3C (Schneider-Legrand)

MART Rovereto | Neogy
  1

Corso Angelo Bettini, 43
Rovereto
TN
38068
Italy
View
2.2 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Upload your own photos for this location: Sign In

Uploaded by ForumElettrico.it on 2024-08-16

Uploaded by ForumElettrico.it on 2024-08-16

Uploaded by ForumElettrico.it on 2024-08-16

Uploaded by ForumElettrico.it on 2024-08-16

Uploaded by ForumElettrico.it on 2024-08-16