Route220 Buscoldocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Evway https://evway.net +39 02 35954219
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]È situata nel parcheggio dell'Istituto Comprensivo di Curtatone ed in pochi minuti a piedi si attiva in centro storico dove troviamo negozi e servizi di vario tipo. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-route220-22-kw-curtatone-mn-via-xxv-aprile-14-buscoldo-t39668.html
https://www.forumelettrico.it/forum/colonnina-route220-22-kw-curtatone-mn-via-xxv-aprile-14-buscoldo-t39668.html Comment by ForumElettrico.it 10/27/2024 16:52:22
Other Charging Locations
There are 9 matching results
IperTosano Curtatone | EnelX
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Route220 Polisportiva Levata
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Quattroventi
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ekomobil - 22 kW
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X McDonald's
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Onoranze Funebri Maffioli
Private - For Staff, Visitors or Customers
Operational
Ekomobil
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Best Western Hotel Cristallo
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Be Charge Motteggiana
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2024-10-27
Uploaded by ForumElettrico.it on 2024-10-27
Uploaded by ForumElettrico.it on 2024-10-27
Uploaded by ForumElettrico.it on 2024-10-27
Uploaded by ForumElettrico.it on 2024-10-27