IPlanet AdS Monte Alto Estcharging location
iPlanet (IT) https://iplanet.eu
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 100 out of 100
- User Feedback - Has recent user verification
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Due CCS Combo 2 da 100 kW situate accanto all'Autogrill che si trova dopo il casello di Desenzano in direzione Trieste. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-iplanet-ultra-fast-ads-monte-alto-est-desenzano-del-garda-bs-a4-km-246-verso-trieste-t46029.html
https://www.forumelettrico.it/forum/colonnina-iplanet-ultra-fast-ads-monte-alto-est-desenzano-del-garda-bs-a4-km-246-verso-trieste-t46029.html Comment by ForumElettrico.it 05/16/2026 07:22:15
[ Important Notice (For Other Users) , Did Not Visit Location ]operational - 2x300kw
Comment by mtt_zande 11/02/2025 09:30:31
Other Charging Locations
There are 9 matching results
IPlanet ads IP Monte Alto Nord
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
ELECTRIEASE ADS Montealto Ovest
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
McDonald's Desenzano del Garda | EnelX Fast
2
10
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Desenzano Motori Srl | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
CC Lonato del Garda Via Mantova | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ELECTRA Via Battaglie
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Burger King Lonato del Garda | evway
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Eni
1
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
NEOGY Parcheggio piscine Desenzano
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2026-05-16
Uploaded by ForumElettrico.it on 2026-05-16
Uploaded by ForumElettrico.it on 2026-05-16
Uploaded by ForumElettrico.it on 2026-05-16
Uploaded by ForumElettrico.it on 2026-05-16